Q: What are the steps involved in building my Meka?
It’s a simple 3 step process: 1) Select your MEKA. 2) Submit your land survey. 3) Work with your MEKA consultant through the design, permitting, build and installation process.
Q: Do your buildings meet local building codes?
Yes. Our modules meet or exceed all local building codes.
Q: Do you offer financing?
Our buildings fall under the category of Modular construction. You can use any local financial institution and apply for a construction loan. To do this, you will need to have us prepare a schematic which includes your floor plans and elevations and a cost estimate.
Q: Do you ship across the United States?
No. we deliver only to Western States.
Q: Do you provide local contractors?
Yes. We assist in all phases of your project to get your building on the ground. Please follow the steps on our Get Started page.
Q: Do you offer warranty?
Yes. We offer standard 1 year on parts and labour, 5 years on electrical and plumbing and 10 years on the physical structure of your MEKA home.
Q: Can my local contractor install the building?
Yes. Our modules are designed as much as possible to be plug and play. Therefore any general licensed contractor can install our modules.
Q: I want to build a 3 bedroom house can you give me a quote?
We can not quote any cost unless we have detailed architectural drawings. Without these we can not quote as there are too many variables.
Q: How long does it take from start to finish to build?
The entire building process takes approximately 6 months for beginning to end. Surprisingly, it is not the fabrication process but the permitting that consumes much of that time period during the approval process.